🚉 Foot overbridge at Guindy railway station

Chennai news in just 5 minutes

Get TLB Chennai, our smart and concise daily guide to charming Chennai in your inbox for FREE.

The new bridge will help ease passenger connectivity from the station’s platforms.

What’s it about? A new 12-metre pedestrian foot overbridge (FOB) will replace an old one located too close to the tracks on platform 1 of the stations. The new FOB will link the eastern entrance on the Race Course Road side with the metro on the western entrance at the GST Road side.

  • Passengers from all five platforms can use the FOB to connect to all exits out of the station. Some minor work remains that will be finished in a few days.
  • The railway safety manual states there should be a minimum distance of 2.36 metres between the track’s centre and a permanent structure. Two of the existing pillars are between 2-2.15 metres.

Danger: In July 2018, seven people were killed travelling on the footboard of a suburban train when it collided with a concrete wall. One of the platforms on the western side, known as the double discharge platform, was developed in 2021 to reduce congestion on the stairs of platforms 2 and 3.

(Image credits: Gowtham Sampath, CC BY-SA 4.0, via Wikimedia Commons)

More Stories from Chennai...

Chennai news in just 5 minutes

Get TLB Chennai, our smart and concise daily guide to charming Chennai in your inbox for FREE.